Case Study: Oracle Remove Asbestos-Containing Heaters From School Refurbishment Project
How Oracle meet a tight deadline to removal asbestos-containing heaters from a school.The site:
A secondary education site
The challenge:
Oracle was approached by the heating contractor to remove asbestos-containing heaters that were found during a recent asbestos refurbishment survey. Time was of the essence as the school needed the works completing during the school break.
What did we do:
Oracle’s team of asbestos specialists were onsite within 48hrs and removed the heaters over the course of a weekend.
The result:
This was an excellent result for the client! Oracle managed to squeeze the removal works into what was already a tight schedule. This meant that the main contractor was able to keep within their scheduled programme of works. As a result, the heating was fully operational in time for the return of the children after their school holiday break.